Then cut and nail the first course of siding along the layout line.
Nails for siding starter strip.
Partly drive a nail 11 2 in.
Insulation for vinyl siding 1.
Hold a tape measure against the exterior wall and travel.
8d hot galvanized spiral siding nails 1 lb pack are hot galvanized for durability and are ideal for fastening your siding project.
As shown in the diagram a wooden spacer can be used to provide the proper angle for the first strip.
Locate the lowest possible corner that has sheathing.
Gap at the end and nail at each stud with a single 8d galvanized box nail held 1 in.
Position starter strip with the top edge of chalk line and allow room for corner posts.
To fasten the siding use galvanized nails sized to penetrate at least 11 2 into the studs.
Measure a spot that is 1 1 2 inches above the bottom edge of the sheathing at this lowest point using a tape.
How to install a vinyl siding starter strip step 1.
Most manufacturers produce a starter strip that secures the bottom course of siding to the sheathing and holds it at the proper angle.
This should be nailed every 6 inches with it s lower edge running along the chalk line.
8d hot galvanized spiral these grip rite 2 1 2 in.
These nails feature a spiral design.
These grip rite 2 1 2 in.
Installing inside corner.
Whether the substrate is plywood sheathing or foam insulation most manufacturers require the siding to be fastened into the studs.